The White Lion Oilfield
PROJECT OVERVIEW
Konia Company has supplied the fire protection valve system (Fire Damper) of Trox Technik for the Su Tu Trang project.
PROJECT DETAILS
On November 15, 2012, Cuu Long JOC received the first gas flow from Su Tu Trang field. With the event of receiving the first gas flow from Su Tu Trang field in accordance with the approved plan, ensuring quality, safety and efficiency, the total production output of Block 15.1 has reached nearly 70,000 barrels of oil equivalent/day. The success of oil and gas exploitation at Su Tu field cluster Lot 15.1 has made an important contribution to supplementing the overall production output of the whole industry, accounting for 10.7% of 2016 production output of the whole Group. ensure national energy security. Total production in 2016 of the whole Oil and Gas Group reached 27.84 million tons of oil equivalent.